Constructability Reviews (CR)

Constructability reviews that catch costly errors before tender.

An independent, builder's-eye review of your drawings and specifications. We find design coordination errors, drawing errors and omissions while they are still a pencil edit, not a change order.

Gordie Howe International Bridge seen from the Canadian side

What is a constructability review?

A constructability review is a structured check of a project's design documents by experienced builders, carried out before the drawings go to tender. It confirms that what has been designed can actually be built, in the order shown, with the information provided, and that every discipline's drawings agree with each other.

We review the drawings and specifications through the eyes of an experienced builder, applying the latest construction methodology and lessons learned from decades of real-world construction and project management. Our reviews are a collaboration with the owner and design team to reduce the high cost of construction and bridge the normal disconnect between design theory and construction reality.

Who it's for

— Owners and developers protecting a construction budget
— Architects and engineers who want a coordinated tender set
— Hospitals, municipalities and public-sector owners
— Hotel, residential and commercial developers
— General contractors and construction managers at pre-construction

Scope of review

What we look for in your drawings

Inter-discipline conflicts

Architectural, structural, mechanical and electrical drawings that disagree on dimensions, levels, openings or locations.

Errors and omissions

Missing details, missing scope and items shown on one sheet but not carried through the rest of the set.

Buildability and sequencing

Details that cannot be installed in the order shown, or that rely on access the site will not have.

Specification conflicts

Specifications that contradict the drawings, which lead to bid disputes, substitutions and code questions.

Site logistics

Crane reach, laydown, phasing and access constraints that affect cost and schedule.

Cost and value

Over-designed or hard-to-build elements where a simpler approach delivers the same result for less.

$20 : $1

Up to $20 saved for every $1 invested in the review

Historically, an average constructability review can return up to $20 for every $1 spent on it. Errors fixed before tender stay out of the contract price, bids carry fewer contingencies, and fewer RFIs reach the site. On an average project, RFI processing alone can exceed $1 million before any work changes.

Based on averages ConstructDR has found through years of project experience.

Our process

Review, model, report, resolve

1

Review

Drawings and specifications reviewed sheet by sheet, the way the trades will build from them.

2

Model

Critical areas built in 3D to expose clashes and coordination errors that 2D drawings hide.

3

Report

A prioritized comment log, each item tied to a sheet, a location and a recommended fix.

4

Resolve

We work with the design team to close every comment and back-check the revised set.

Deliverables

— Comment log by sheet reference, issue type and priority
— Marked-up drawing set (PDF / Bluebeam)
— Clash and coordination report for modelled areas
— Executive summary of cost and schedule risks
— Review meetings with the design team and back-check of revisions

Review milestones

— 30%: schematic / design development, systems, structure and sequencing strategy
— 60%: construction documents, full constructability and coordination review
— 90%: pre-tender back-check, scope gaps and specification conflicts

Constructability review FAQs

When should a constructability review be done?

As early as possible. The most value comes at 30%, 60% and 90% design milestones, while changes are still inexpensive. A single review before tender still pays for itself on most projects.

How is it different from a peer review?

A peer review checks a design against engineering and code requirements. A constructability review looks at whether it can be built as drawn: coordination between disciplines, sequencing, access, missing scope and the cost of building it.

Do you replace the architect or engineer?

No. We are an independent set of eyes with decades of real construction experience. The design team keeps responsibility for the design; we understand the intent of the design and how to identify issues that would affect the constructability of the building or project, and recommend affordable fixes so they can resolve them quickly.

How long does a review take, and what does it cost?

It depends on the size of the project, the number of disciplines and the design stage. Send us your project details and we will provide a fixed scope, schedule and fee.

Which types of projects do you review?

We have collectively over a century of real-world construction experience and have built many projects throughout Canada, from hospitals and long-term care, hotels, luxury condominiums, office high-rises, commercial and retail, to infrastructure including bridges and ports of entry, with budgets from $5 million to over $5 billion. Our experience allows us to accurately review just about any size or type of project, as long as we have enough information to understand the intent of the design.

Find the costly mistakes on paper, before they're poured in concrete.